Carregar apresentação
A apresentação está carregando. Por favor, espere
1
Auxilio a Resolução do PjBL
Projeto da Rede do Bloco 8
2
Projeto Físico
3
Adicionar Módulo no Switch MultiLayer
PORTA ÓTICA (GLC-LH-SMD) FONTE DE ALIMENTAÇÃO
4
Adicionar Módulo no ROTEADOR
PORTA ÓTICA (GLC-LH-SMD) PLACA COM CONECTOR SFP (HWIC-1GE-SFP)
5
Projeto Lógico Configurar Roteamento entre VLANs no Switch MultiLayer
Configurar VLANs nos Switches L2 Configurar DHCP no Switch MultiLayer Configurar o roteamento entre o Bloco 8 e o prédio Administrativo Configurar IP dos Servidores do Bloco Administrativo Configurar o Servidor DNS Criar Páginas HTML de exemplo dos servidores Blackboard e Intranet
6
Roteamento no Switch MultiLayer
interface vlan 2 ip address no shutdown interface vlan 3 ip address interface vlan 4 ip address interface vlan 5 ip address interface vlan 6 ip address end enable configure terminal ip routing vlan 2 name POS vlan 3 name SMART vlan 4 name NIAA vlan 5 name REDES vlan 6 name ADMIN exit OBS. Junte as duas colunas no notepad antes de colar no SWITCH
7
Switches Layer 2 (TERREO)
SW0A - ADMIN SW0B - POS enable configure terminal interface range Fa0/1-5 switchport access vlan 6 exit interface Gi0/1 switchport mode trunk end enable configure terminal interface range Fa0/1-20 switchport access vlan 2 exit interface Gi0/1 switchport mode trunk end
8
Switches Layer 2 (PRIMEIRO ANDAR)
SW1A – LAB NIAA SW1B – LAB NIAA SW1C – SMART GRID enable configure terminal interface range Fa0/1-24 switchport access vlan 4 exit interface Gi0/1 switchport mode trunk end enable configure terminal interface range Fa0/1-24 switchport access vlan 4 exit interface Gi0/1 switchport mode trunk end enable configure terminal interface range Fa0/1-20 switchport access vlan 3 exit interface Gi0/1 switchport mode trunk end
9
Switches Layer 2 (SEGUNDO ANDAR)
SW2A – REDES SW2B – POS SW2C – POS enable configure terminal interface range Fa0/1-24 switchport access vlan 5 exit interface Gi0/1 switchport mode trunk end enable configure terminal interface range Fa0/1-24 switchport access vlan 2 exit interface Gi0/1 switchport mode trunk end enable configure terminal interface range Fa0/1-6 switchport access vlan 2 exit interface Gi0/1 switchport mode trunk end
10
DHCP no Switch MultiLayer
enable configure terminal ip dhcp pool pos network dns-server default-router exit ip dhcp pool smart network default-router ip dhcp pool niaa network default-router ip dhcp pool redes network dns-server default-router exit ip dhcp pool admin network default-router ip dhcp excluded-address ip dhcp excluded-address ip dhcp excluded-address ip dhcp excluded-address ip dhcp excluded-address end OBS. Junte as colunas no notepad antes de colar no SWITCH
11
TESTES Habilite o DCHP nos computadores e verifique se eles pegaram o IP correspondente ao seu setor (POS, ADMIN, etc ...)
12
Conexão entre o Bloco 8 e o Prédio Administrativo
ROTEADOR DO PREDIO ADMINISTRATIVO SWITCH MULTILAYER enable configure terminal interface Gi0/1/0 ip address no shutdown interface Gi0/0 ip address exit ip route end enable configure terminal interface Gi1/1/1 no switchport ip address exit ip route end
13
Configuração dos Servidores
14
Configuração do Servidor DNS
15
Ciar Páginas de Teste <HTML>
<H1> BEM VINDO AO SERVIDOR BLACKBOARD </H1> </HTML>
16
Ciar Páginas de Teste <HTML>
<H1> BEM VINDO AO SERVIDOR INTRANET </H1> </HTML>
17
Teste de Acesso a Partir dos Computadores
18
Entrega do Projeto Arquivo Packet Tracer Incluir no arquivo:
Comentários sobre o tipo de cabeamento utilizado Estimativa de custo do cabeamento (custo por metro para cada tipo de cabo escolhido) Estimativa de custo dos equipamentos de rede (Switches e Roteadores)
Apresentações semelhantes
© 2024 SlidePlayer.com.br Inc.
All rights reserved.