Brazil Infrastructure Investment Opportunities CELSO KNIJNIK

Slides:



Advertisements
Apresentações semelhantes
RCAAP Project João Mendes Moreira, FCCN Berlin 7, Paris, 04/12/2009.
Advertisements

Laboratório de Sistemas Distribuídos (LSD) – Universidade Federal de Campina Grande (UFCG)EELA Grid School – December 04, 2006 Enhancing SegHidro/BRAMS.
Recursos Genéticos e Biotecnologia Um Brasil que dá gosto PEST RISK ANALYSIS ON INVASIVE ALIEN SPECIES THAT THREATEN BRAZILIAN BIOLOGICAL DIVERSITY Martins,
São Paulo - November 7, 2013 Measuring the Cost of Formalization in Brazil © 2003 The Ronald Coase Institute Adopting RCI methodology to measure start.
INPAs insights on LBA (and its role as the coordinating institution): (based on and the message from INPAs General Director, Dr Adalberto Val, and on former.
Companhia de Água e Esgoto do Estado do Ceará The Ceará State water and watewater company Companhia de Água e Esgoto do Estado do Ceará The Ceará State.
Fatores Sócio-Econômicos Iniciativas para o Setor Melhorias no processo de Registro de Imóveis Padronização do processo de avaliação Evolução do marco.
Fact Pack Railway sector in Brazil January, 2005
Ensuring Community Participation in Developing An HIV Prevention Intervention for Psychiatric Settings: A US-Brazil Collaboration M.L. Wainberg 1, V. Terto.
North Atlantic Ocean BRAZIL South Pacific Ocean South Atlantic Ocean
The portuguese public universities José Marques dos Santos Vice-President of the Council of Rectors of Portuguese Universities (CRUP) Rector of University.
Portugal – Fraunhofer Gesellschaft Agreement
III REUNIÃO DE COORDENAÇÃO REGIONAL DA BVS Lewis Joel Greene Editor Brazilian Journal of Medical and Biological Research Medical School of Ribeirão Preto.
Curso de ADMINISTRAÇÃO
LIMITS OF DETECTION OF AN TOTAL REFLECTION X-RAY FLUORESCENCE SYSTEM WITH DOUBLE REFLECTION MODULE V. F. Nascimento Filho 1,2, V. H. Poblete 3 P., P. S.
1,1 (20%) bilhões de pessoas não tem acesso a água de qualidade adequada ao consumo 2,4 (40%) bilhões de pessoas não tem acesso as condições básicas de.
Cancer Mortality Among Agricultural Workers in the State of Rio de Janeiro, Brazil Armando Meyer National School of Public Health/ Oswaldo Cruz Foundation.
Balanço geral dos recursos RENAST liberados aos CERESTs Regionais do estado de São Paulo SECRETARIA DE ESTADO DA SAÚDE COORDENADORIA DE CONTROLE DE DOENÇAS.
O PROGRAMA JORNAL E EDUCAÇÃO DA ANJ. O que é ? Programa que reúne as iniciativas de leitura realizadas pelos associados: com prioridade para os alunos.
TECNOLOGIA DE VINHOS.
Apresentação de Estágio Supervisionado X
Cidade do Conhecimento Instituto de Estudos Avançados Depto. Cinema, Rádio e TV Escola de Comunicações e Artes Cidade.
SECEX SECRETARIA DE COMÉRCIO EXTERIOR MINISTÉRIO DO DESENVOLVIMENTO, INDUSTRIA E COMÉRCIO EXTERIOR BRAZILIAN EXPORTS STATISTICAL DEPURATION SYSTEM Presentation.
Calheta Hydroelectric Reversible System – Calheta III
EVIK SECURITY SERVICES
República de MoçambiqueCOREP EDUCAÇÃO PARA O TRABALHO COMPETÊNCIAS PARA A PRODUÇÃO DESENVOLVIMENTO PARA O PAÍS EDUCAÇÃO PARA O TRABALHO COMPETÊNCIAS PARA.
IEEE PES General Meeting, Tampa FL June 24-28, 2007 Conferência Brasileira de Qualidade de Energia Santos, São Paulo, Agosto 5-8, Chapter 3 Harmonic.
AEROPORTO NO JAPÃO. VEJAM SÓ, "ILUMINADOS" ENGENHEIROS DESTE PAÍS, QUE NÃO CONSEGUEM FAZER UM TÚNEL DE 150 MTS NO TERREIRO DO PAÇO SEM METER ÁGUA, NEM.
BLUE BEAUTY Photos by Astronaut Sunita Williams Photos by Astronaut Sunita Williams.
Norman de Paula Arruda Filho / ISAE The New Role of Management Education A Brazilian Experience NORMAN DE PAULA ARRUDA FILHO Buenos Aires, 6 de dezembro.
Programa de Investimentos em Logística:
ENERGIA LIMPA: OPORTUNIDADES E DESAFIOS PARA O BRASIL CLEAN ENERGY: OPPORTUNITIES AND CHALLENGES FOR BRAZIL Thomson Reuters Foundation Maio/May 2012.
Increasing Wind Power Generation Penetration Degree in Brazil: a Challenge for the Brazilian Interconnected Power System Francisco José Arteiro de Oliveira.
Curso Gestão Estratégica de Dívida Pública para os Estados Workshop on Debt Management Strategies for Brazilian Subnationals Jorge Luís Tonetto CONFAZ/GEFIN.
Estoril - 21 de Setembro de Criada em 1998, a APISOLAR - Associação Portuguesa da Indústria Solar, tem como objectivo principal assumir a defesa.
Knowledge Extraction from the Web (ISEWO)
G4073 PETROLEUM PRODUCTION IN BRAZIL PETROLEUM PRODUCTION IN BRAZIL Dr. Celso Augusto G. SANTOS Disciplina: Mecânica dos Solos I UFPB João Pessoa Feevereiro.
Lecture 2 Properties of Fluids Units and Dimensions 1.
Session II: Key Elements of Structured Finance for Renewable Programs and Energy Efficiency “Financial Instruments to Promote Sustainability and Climate.
2010 New Years Trip to Argentina and Brazil Trip Sponsored by.
North Atlantic Ocean BRAZIL South Pacific Ocean South Atlantic Ocean
ENVIRONET N ETWORK OF C ENTRES OF E XCELLENCE ON E NVIRONMENTAL R EMEDIATION AN OVERVIEW OF INDÚSTRIAS NUCLEARES DO BRASIL - INB - INDÚSTRIAS NUCLEARES.
Instituto de Engenharia de Sistemas e Computadores Investigação e Desenvolvimento em Lisboa Ontology Building Process: The Wine Domain João Graça, Márcio.
BRAZILIAN NATIONAL BUOY PROGRAMME PNBOIA August 2004.
CLIQUE PARA INSERIR TÍTULO Clique para inserir o primeiro nível de texto Segundo nível Terceiro nível Quarto nível Quinto nível International Public Sector:
Título do Mestre _____ ____ ______ __ _______ __ _____ ______ ______ _____ _______ _____ _____ _____ Clique para editar os estilos do texto mestre Segundo.
Our Mission: To build the world’s best, high value moulds through the integration of technically superior engineering, manufacturing.
RIO DE JANEIRO STATE FELIPE P .– 7º D.
Brasil Innovaciones censales Instituto Brasileiro de Geografia e Estatística – IBGE Taller “IPUMS América Latina II” Ciudad de Panamá, Panamá.
Brazil Upstream Guide An overview of the sector Brazil in Context Upstream Taxation & Foreign Investment Contacts September 2010.
Loreena McKennitt The Mummers’ Dance km Typical sight from a satellite.
THE NUMBERS.
Cigré/Brasil CE B5 – Proteção e Automação Seminário Interno de Preparação para a Bienal 2006 Rio de Janeiro, setembro/06.
Logistic Infrastructure Scenario in Brazil Berlin, September 21, 2010 Paulo Sérgio Passos Minister.
Lei de Cotas: Looking at the Implementation of the Brazilian Employment Quota in São Paulo, Brazil Anna C. O’Kelly.
Sistema Nacional de Exploração e Gestão de Informação Cadastral Project Overview Rui Pedro Julião Deputy Director General
RELATÓRIO CEMEC 06 COMPARAÇÕES INTERNACIONAIS Novembro 2013.
Home page: INSTITUTO NACIONAL DE ESTATÍSTICA Manufacturing statistics in Mozambique Workshop on Manufacturing Statistics 4-7 May 2009, Lusaka,
ENTERTAINMENT LAW Denis Borges Barbosa Português - English ADVOGADOS
1 ST INTERNATIONAL FORUM OF THE RAIL TARIFF REGULATORS The experience and development of railway infrastructure in Brazil ABIFER - Brazilian Association.
IEEE PES General Meeting, Tampa FL June 24-28, 2007 Conferência Brasileira de Qualidade de Energia Santos, São Paulo, Agosto 5-8, Chapter 8: Procedure.
INSTITUTO DE DESENVOLVIMENTO INTEGRADO DE MINAS GERAIS The development agency of Minas Gerais.
AMAZONIA German-Brazilian Initiative
A estratégia da IBM para a região RJ/MG/ES
GoSpeak.org To Brazil And Beyond. ► Why Brazil? ► Why now? ► Why GoSpeak?
Company Profile 04 Sept 2015 Rua Félix de Sousa, 71 - Vila Congonhas – CEP: São Paulo SP - Phone: (55+11) Fax: (55+11) /39.
Internationalization
Brazil South America.
The Systems Life Cycle Feasibility Study Analysis / Investigation
The following are the CSD Responses in relation to the IEEE P802
Transcrição da apresentação:

Brazil Infrastructure Investment Opportunities CELSO KNIJNIK Brasil 11.21.2011 CELSO KNIJNIK Special Advisor Executive Office of the President of Brazil

PAC – Growth Acceleration Program In 2007 – PAC 1 To accelerate economic growth To increase employment and income rates To decrease social and regional inequalities To overcome infrastructure bottlenecks In 2009, a new goal To reduce the impact of the international economic crisis – countercyclical policy In 2010, launched a new stage: PAC 2 – 2011-2014

Growth Acceleration Program – Concept PAC – Growth Acceleration Program Concept Growth Acceleration Program – Concept Two blocks of action: Make the investment enviroment better: Credit raise Tax relieves Tax system improvements Regulation refinements Infrastructure works To incentive private investment To remove obstacles - bureaucratic, administrative, normative, law-abiding, environmental impacts and legislative - related to growth To increase public investment in infra-structure

GROWTH ACCELERATION PROGRAM – PAC 1, 2007-2010 Infrastructure projects in three areas US$ billion Area 2007-2010 After 2010 TOTAL LOGISTICS 54.5 28.9 83.3 ENERGY 171.7 429.4 601.1 SOCIAL AND URBAN 146.8 18.0 164.9 373.0 476.3 849.3 * US$ = R$ 1,76 4 4

Preliminary investment forecast GROWTH ACCELERATION PROGRAM – PAC 2, 2011-2014 Preliminary investment forecast US$ billion Area 2011-2014 After 2014 TOTAL LOGISTICS 59.4 2.6 61.9 ENERGY 262.3 356.2 618.5 SOCIAL AND URBAN 221.0 - 542.6 358.8 901.4 5

INVESTMENT OPPORTUNITIES: POWER GENERATION AND TRANSMISSION OIL AND GAS HOUSING AND SANITATION HIGHWAYS RAILROADS – High-Speed Rail AIRPORTS PORTS URBAN MOBILITY

ELECTRIC POWER GENERATION AND TRANSMISSION

ELECTRIC POWER SYSTEM – GENERAL FEATURES Installed Capacity – 105,066 MW Number of Customers – 64.6 million Energy Production – 463.2 TWh / year – 60% of South America Peak – 67,632 MW Transmission Lines – 96,207 km ≥ 230kV Source: Ministry of Mines and Energy 8 8

ELECTRIC POWER GENERATION 2011-2014 54 HPP – 47.856 MW – US$ 54,8 billion Annual tenders to contract energy in the regulated contracts environment Hydroelectric power plants – energy to be delivered at the fifth year after the tender Thermal power plants and others – energy to be delivered at the third year after the tender Needs previous environmental license to participate Tenders planned 2011 7 HPP – 1,470 MW – US$ 2,1 billion – 1st half 3 HPP – 1,096 MW – US$ 1,5 billion – 2nd half New enterprises as thermoelectric plants will have to be included accordingly to the 2008-2020 planning 9 9

UHE Santo Antônio do Jari HYDRIC SOURCES – ELETRIC POWER GENERATION North Region Cachoeira Caldeirão Ferreira Gomes UHE Santo Antônio do Jari Cachoeira do Caí São Luiz do Tapajós UHE Belo Monte Marabá UHE Serra Quebrada Jatobá UHE Estreito Jamanxim Chacorão Tabajara UHE Santo Antônio Santa Izabel UHE Jirau Cachoeira dos Patos Jardim do Ouro Usinas plataforma PAC 2 UHE São Salvador PAC 1 UHE Rondon II PAC 1 com conclusão original após 2010 10 10

UHE Estreito do Parnaiba HYDRIC SOURCES – ELETRIC POWER GENERATION Northest Region UHE Castelhano UHE Estreito do Parnaiba UHE Cachoeira UHE Uruçui UHE Ribeiro Gonçalves UHE Riacho Seco PAC 1 com conclusão original após 2010 11 11

HYDRIC SOURCES – ELETRIC POWER GENERATION Southest Region UHE Formoso UHE Retiro Baixo UHE Baguari UHE Davinópolis UHE Resplendor UHE Pompeu UHE Travessão UHE Crenaque UHE Baú I UHE Barra do Braúna UHE Simplicio PAC 2 PAC 1 PAC 1 com conclusão original após 2010 12 12

HYDRIC SOURCES – ELETRIC POWER GENERATION South Region UHE Telêmaco Borba UHE São João UHE Tijuco Alto UHE Cachoeirinha UHE Mauá UHE Baixo Iguaçu UHE Salto Grande UHE Foz do Chapecó UHE Paranhos UHE Garibaldi UHE São Roque UHE Itapiranga UHE Monjolinho UHE Passo São João UHE Salto Pilão UHE São José Binacional (2) UHE Pai-Querê UHE 14 de julho UHE Castro Alves PAC 2 PAC 1 PAC 1 com conclusão original após 2010 13 13

UHE Barra dos Coqueiros UHE Salto do Rio Verdinho HYDRIC SOURCES – ELETRIC POWER GENERATION Center-west Region UHE São Manoel UHE Foz do Apiacás UHE Mirador UHE Teles Pires UHE Porteiras UHE Dardanelos UHE Corumbá III UHE Colíder UHE Sinop UHE Toricoejo UHE Água Limpa UHE Couto Magalhães UHE Batalha UHE Barra dos Coqueiros UHE Caçu UHE Porteiras UHE Serra do Facão UHE Foz do Rio Claro UHE Salto Usinas plataforma PAC 2 UHE Salto do Rio Verdinho PAC 1 UHE São Domingos PAC 1 com conclusão original após 2010 14 14

TOTAL PROJECTED INVESTMENT- US$ 5.5 billion ALTERNATIVE ENERGY SOURCES From 2011 to 2014 71 Wind Power Plants – 1.803 MW 3 Biomass TPP – 224 MW TOTAL PROJECTED INVESTMENT- US$ 5.5 billion New alternative energy sources bidding will be planning annualy and added to the programm, according to the energy long-term plan 15 15 15

Alternative Energy Sources Wind Power Aratua 1 Araras Coqueiros Areia Branca Buriti Quixaba Miassaba 3 Cajucoco Garças Lagoa Seca Vento do Oeste Morro dos ventos I, III, IV, VI, IX Dunas do Paracuru Taíba Águia Rei dos Ventos 1, 3 Taíba Andorinha Icarai I e II Eurus VI Colonia Cabeco Preto Embuaca Mangue Seco 1, 2 , 3 e 5 Barra dos Coqueiros Planaltina Faisa I, II, III, IV e V Mar e Terra Porto Seguro Santa Clara I Rio Verde Guirapa Icarai Guanambi Igapora Sangradouro 3 Candiba Serra do salto Alvorada Ilheus Sangradouro 2 Pedra do Reino Pindai Santa Clara II, III, IV, V e VI Osório 2 Seabra Macaubas Nossa Senhora da Conceição Fazenda Rosário 3 Pajeu do vento Licinio de Almeida Novo Horizonte Coxilha Negra V Coxilha Negra VI PAC 2 Coxilha Negra VII Fazenda Rosário 16

ELECTRIC POWER TRANSMISSION Large interconnections To provide greater security and reliability to the electric power supply To complete the interconnection of the Isolated Systems to the National Interconnected System To ensure the energy flow from large hydropower projects – Belo Monte, Tapajós and Teles Pires To meet the expanding demand in all country regions Tenders planned 2011 615 km – US$ 553 million – 1st half 2010 2011-14 36,000 km – US$15.6 billion 17 17 17

ELECTRIC POWER TRANSMISSION North Region PAC 2 Interligação Manaus – Boa Vista Interligação Tucuruí -Manaus -Macapá PAC 1 PAC 1 com conclusão original após 2010 LT Tucuruí – Tucuruí Vila LT Itacaiúnas – Integradora Lechuga – Jorge Teixeira LT Itacaiúnas – Carajás C3 Interligação Tapajós - Sudeste LT Integradora Sossego - Xinguara Interligação das Usinas do Madeiraa C1 e C2 Interligação N – CO III (Rio Branco – Jauru) Interligação N-NE e N-SE Interligação Norte - Sul III Ji- Paraná - Vilhena Interligação N–CO Vilhena - Samuel Interligação N-CO III (Jauru - Vilhena) Interligação N-NE ( Colinas-S.J.do Piauí) 18 18

ELECTRIC POWER TRANSMISSION Northeast Region São Luiz II – São Luiz III C1 Teresina II – Teresina III São Luiz II – São Luiz III C2 Milagres - Tauá Miranda – Encruzo Novo Banabuíu - Mossoró Interligação Açailândia – P.Dutra – São Luiz Picos - Tauá Paraíso - Açu II P.Dutra – Miranda II Pau Ferro – Santa Rita II Açailândia – P.Dutra Milagres - Coremas Balsas - Ribeiro Gonçalves Xingó - Angelim Interligação N-NE (S.J. Piauí – Milagres) Jardim - Penedo Interligação N-NE (Colinas - S.J. Piauí) Ibicoara – Brumado II Interligação N-NE e N-SE Sapeaçu – Sto. Antônio de Jesus C3 Funil - Itapebi PAC 2 Eunápolis – T.de Freitas II C1 PAC 1 Eunápolis – T.de Freitas II C2 PAC 1 com conclusão original após 2010 19 19

ELECTRIC POWER TRANSMISSION Southeast Region Estreito – Nova Ponte - Emborcação Paracatu - Pirapora Chapadão – Ilha Solteira Irapé - Araçuaí Interligação Norte - Sudeste LT Itumbiara - Bom Despacho Montes Claros - Pirapora LT São Simão – Itaguaçu Mascarenhas - Verona LT São Simão – Ribeirão Preto Mascarenhas - Linhares Interligação Tapajós - Sudeste Furnas – Pimenta C2 Interligação Teles Pires - Sudeste Mesquita - Viana Estreito – Ribeirão Preto Neves - Mesquita Interligação das Usinas do Madeira Porto Velho – Araraquara SP LT Campos - Macaé Itutinga - Juiz de Fora Bom Despacho 3 – Ouro Preto 3 Interligação Sul - Sudeste Interligação Região Sudeste Jaguara – Poços de Caldas PAC 2 Taubaté – Terminal Rio PAC 1 PAC 1 com conclusão original após 2010 Itararé - Jaguariaíva Araraquara - Taubaté Araraquara - Nova Iguaçu 20 20

ELECTRIC POWER TRANSMISSION South Region Ivinhema - Umuarama LT Londrina - Maringá Cascavel do Oeste - Umuarama Londrina Esul – Londrina Copel Umuarama - Guaíra Interligação Sul - Sudeste LT Cascavel Oeste – Foz do Iguaçu Norte LT Itararé - Jaguariaíva Bateias - Pilarzinho Foz do Iguaçu - Cascavel Oeste Curitiba - Bateias Salto Osório – Foz do Chopim Curitiba – Joinville Norte Videira – Campos Novos Desterro – Palhoça Machadinho – Campos Novos Jorge Lacerda B - Siderópolis Garibaldi – Monte Claro Rio do Sul – Barra Grande Campo Bom - Taquara Campos Novos – Nova Santa Rita Nova Santa Rita – Porto Alegre 9 LT Santa Cruz I – Presidente Médici Viamão - Restinga Porto Alegre 9 – Porto Alegre 4 PAC 2 Porto Alegre 9 – Porto Alegre 8 Porto Alegre - Restinga PAC 1 21 21

ELECTRIC POWER TRANSMISSION Center-east Region Nova Mutum- Sorriso - Sinop Interligação Tapajós - Sudeste Interligação Teles Pires - Sudeste Cuiabá – Nobres – Nova Mutum C2 Serra da Mesa – Barro Alto Cuiabá – Ribeirãozinho - Rio Verde Norte Juína - Brasnorte Interligação N – Sudeste Brasnorte – Nova Mutum Rio Verde Norte - Trindade Interligação N – S III Parecis - Brasnorte Interligação Madeira Porto Velho – Araraquara C1 e C2 Trindade - Carajás Interligação N – CO III (Rio Branco – Jauru) Trindade - Xavantes Interligação N-CO (Jauru – Vilhena) Brasnorte – Juba Juba - Jauru Jauru - Cuiabá Barra dos Coqueiros -Quirinópolis Luziânia - Emborcação Itaguaçu – Barra dos Coqueiros Palmeiras - Edéia São Simão - Itaguaçu Itumbiara – Bom Despacho Corumbá – Anastácio São Simão – Rib. Preto PAC 2 PAC 1 Anastácio - Chapadão Chapadão - Jataí PAC 1 com conclusão original após 2010 Chapadão – Ilha Solteira 2 22 22

OIL AND GAS Exploration, Production and Natural Gas Transport Infrastructure

Increase oil and gas production PRODUCTION AND EXPLORATION Increase oil and gas production Seismic assessment, drilling, plataform production To explore the reserves and enlarge national production, including the new Pre-Salt discoveries Value chain: naval industry; mecaninc engineering, steel, quimic, precision engineering among other Identificado problema de fixação dos parafusos da “árvore de natal” molhada, que ficam na cabeça do poço no fundo do mar. O conjunto foi substituído e o poço fechado para a instalação dos novos equipamentos. US$ 418,5 billion 2011-2014 – US$ 110.4 billion Pós 2014 – US$ 308 billion

Parque das Baleias – P-57 e P-58 Baleia Franca e Baleia Anã PRODUCTION AND EXPLORATION – Pré-salt level Bacia de Santos Bacia de Campos TLD Tupi Parque das Baleias – P-57 e P-58 Baleia Azul, Jubarte, Baleia Franca e Baleia Anã Piloto Tupi Piloto Guará Piloto - Baleia Azul 8 FPSO Piloto - Tupi Nordeste Novas Descobertas Exploração Pré-Sal Pré - Salt 17 TLD´s US$ 73.9 billion 2011-2014 – US$ 37.9 billion Pós 2014 – US$ 61.2 billion PAC 2 PAC 1 PAC 1 com conclusão original após 2010

REFINEMENT, PETROCHEMESTRY and FERTILIZER Refinaria Premium I Refinaria Clara Camarão Refinaria Premium II Refinaria Abreu e Lima Petroquímica Suape – PTA FAFEN-SE Sulfato de amônio Petroquímica Suape – PET POY Fabrica de Amônia Complexo Químico UFN-4 Fábrica de Fertilizantes Nitrogenados III Complexo Petroquímico do Rio US$ 76.6 billion 2011-2014 – US$ 41,8 billion Pós 2014 – US$ 34,71 billion PAC 2 PAC 1 PAC 1 com conclusão original após 2010

HIGHWAYS

Central-South Region 54% of Brazil’s GDP FEDERAL HIGHWAY CONCESSION PROGRAM Central-South Region 54% of Brazil’s GDP Length: 2,212.4 km BR-040/Distrito Federal-Goiás-Minas Gerais – 937 km BR-116/Minas Gerais – 817 km BR-101/Espírito Santo – 458.4 km Total Investment: US$ 5.5 billion Governador Valadares Belo Horizonte GO DF MG BR-040 BR-116 Vitória ES BR-101 Concession bidding 1st Half, 2011 28

CONCESSION MODEL Internal Rate of Return: 8.0% per year Reference value used on the 3rd Phase of the Federal Highway Concession Program Term of Concession: 25 years Annual tariff adjustment according to inflation variation Investments described in the Highway Usage Program Constructions required (recovery, duplication, lighting, and others) Constructions conditioned to the volume of traffic (to expand capacity) Performance Parameters: paving, safety, signage, lighting, user assistance, and others. Focus on service quality Concessionaire performs the necessary investments in the most efficient way to meet the Performance Parameters *Allows the participation of Brazilian or foreign companies, financial institutions, pensions funds and private equity funds, separately or in consortiums 29

HIGH-SPEED RAILS PLANNED 36 million inhabitants Resende Taubaté São José dos Campos Metropolitan Region of Campinas Volta Redonda Metropolitan Region of São Paulo Metropolitan Region of Rio de Janeiro Campinas - São Paulo - Rio de Janeiro – 511 km Market Potential Metropolitan Region of São Paulo: 19 million inhabitants Metropolitan Region of Rio de Janeiro: 12 million inhabitants Metropolitan Region of Campinas: 2.5 million inhabitants Economic Importance Rio de Janeiro and São Paulo States concentrate 45 % of Brazil’s GDP São Paulo is Latin America's biggest financial center, concentrating 70% of the stock market Rio de Janeiro is the biggest Brazilian tourism hub Concession bidding 2nd Quarter, 2011

HIGH-SPEED RAIL – HSR Project scope Estimated investment: US$ 19.7 billion Deadline for entry into operation: 2016 Concessionaire responsible for the design, construction, operation and maintenance, complying with technical performance parameters; Auction to be open to all existing technologies Compulsory technology transfer Public sector participation: own capital and financing Documentation available at www.tavbrasil.gov.br Technical studies on demand, alignment, geology, operation and economic-financial modeling completed and available 31

Brazil Infrastructure Investment Opportunities CELSO KNIJNIK Brasil 11.21.2011 CELSO KNIJNIK Special Advisor Executive Office of the President of Brazil